What type of ground preparation is needed for long term installations?

The only ground preparation needed for long term installations is to level the surface below so that you do not have too much side slope (up to several degrees of side slope is tolerable) and to remove or fill over obvious stumps, humps and rocks so that the surface is evenly supported by the ground below. 

The panels are 2 inches thick, so a surface installation will leave you with a 2" lip along each edge that can be easily beveled out by adding a little soil.  Recessing the panels into the ground is an option, particularly across lawns and golf courses where there may be frequent cross traffic by mowers and other light vehicles.

There is no need for any aggregate or subsurface preparation since the panels spread their weight over the subsurface.  If the ground is exceedingly wet and soft (if you sink in over your ankles), you should lay geotextile down first. 

Geotextile or landscaping fabric underneath can also be helpful in reducing the growth of grass up through the drain holes in the panels,  although foot and wheel traffic on high use paths will naturally keep the grass in check.

Can the path system be installed close to trees?

Installing a path close to trees does not disturb the roots and as the trees and roots grow, root heaving of the path causes little problem.  Rather than crack and buckle from root growth, like concrete or asphalt, the path will gently flex up. Water and air can flow down through the path surface to the roots below.

 

 

* * * * *